Production line
Tailings & Solid Waste Recovery Line
A recovery line reprocesses tailings or construction solid waste into usable aggregate or concentrate. Configuration follows a feed material assessment.
Request configurationMain image is a process / layout diagram supplied by RenTai; final equipment and capacity are confirmed per project.
Typical configuration
Example list — final configuration by project| Stage | Equipment | Function |
|---|---|---|
| Feeding | Vibrating feeder | Controlled feed of reclaimed material |
| Crushing | Impact / jaw crusher | Size reduction of waste feed |
| Screening | Vibrating screen | Fraction separation |
| Washing | Sand washer / dewatering screen | Cleaning and dewatering |
| Conveying | Belt conveyor | Transfer to stockpile |
Process flow
Feed
→Crush
→Screen
→Wash
→Dewater
→Stockpile
Equipment sizes and capacities are confirmed after material and throughput requirements are received.
Process flow chart
Mineral Recovery & Tailings FlowThe original chart uses Chinese process labels; the stage table and flow above give the English summary.
Request configuration
Send your material, required capacity and output size for a configuration proposal.